07/24/22 Modern Sub Back From CGC...

Modern, no fast tack. Delivered 5/17. Entered as received 5/17. Shipped 07/13/22. TAT 38 working days. Every case but the Giant-Size Defenders have newton rings on the front and back. 11 casses arrived crack on the bottom left side.


I didn't save the original Photoshop file so I wasn't able to position the text correctly on this which is why it looks wonky. Obviously I overestimated a lot of these. I'm apparently terrible at grading moderns. It's one thing to have lower grades than expected but also have almost half the cases arrive cracked and have all but one arrive with newton rings on the front and back is a bit infuriating.